  1. 1. 67th BPSC Prelims 2022

    The Pattiseema Project is associated with the integration of which of the following rivers?

    1. AKrishna and Kaveri
    2. BKrishna and Godavari
    3. CGodavari and Mahanadi
    4. DGanga and Brahmaputra
    5. ENone of the above/More than one of the above
    Answer and explanation →
  2. 2. 48th–52nd BPSC Prelims 2008

    The maximum irrigation potential of India is created through:

    1. AMajor Projects
    2. BMinor projects & Major Projects
    3. CMinor Projects
    4. DMedium Projects
    Answer and explanation →
  3. 3. BPSC CDPO Prelims 2018

    The origin of the Indira Gandhi Canal, which irrigates the Thar Desert, is -

    1. ABhakra Dam
    2. BHathnikund Barrage
    3. CHarike Barrage
    4. DRanjit Sagar Dam
    5. ENone of the above/More than one of the above
    Answer and explanation →
  4. 4. BPSC TRE-3 (Jul 2024)

    Which of the following is called the longest canal in India?

    1. ASethusamudram Ship Channel
    2. BSharda Canal
    3. CIndira Gandhi Canal
    4. DMore than one of the above
    5. ENone of the above
    Answer and explanation →
  5. 5. BPSC TRE-3 (Jul 2024)

    For what purpose is water used the most in India?

    1. ADomestic
    2. BIndustries
    3. CIrrigation
    4. DMore than one of the above
    5. ENone of the above
    Answer and explanation →
  6. 6. 42nd BPSC Prelims 1997

    Bhakra Nangal is a joint project of –

    1. AHaryana, Punjab and Rajasthan
    2. BHaryana, Punjab and Delhi
    3. CHimachal Pradesh, Haryana, Punjab
    4. DPunjab, Delhi, Rajasthan
    Answer and explanation →
  7. 7. 45th BPSC Prelims 2001

    On which river is the Bhakra Nangal dam built?

    1. ARavi
    2. BIndus
    3. CChenab
    4. DSutlej
    Answer and explanation →
  8. 8. 43rd BPSC Prelims 1999

    Which of the following is the oldest hydropower station in India?

    1. AMayurakshi
    2. BMachkund
    3. CPallivasar
    4. DShivsamudram
    Answer and explanation →
  9. 9. 56th–59th BPSC Prelims 2014

    ‘Nagarjuna Sagar Multipurpose Project’ is on which river?

    1. ATapti
    2. BKosi
    3. CGodavari
    4. DKrishna
    Answer and explanation →
  10. 10. 44th BPSC Prelims 2000

    On which river is the Hirakud Dam constructed?

    1. AShivnath
    2. BNarmada
    3. CMahanadi
    4. DSon
    Answer and explanation →
  11. 11. 45th BPSC Prelims 2001

    Maithon, Belpahari and Tilaya dams are constructed on the river-

    1. ADamodar
    2. BBarakar
    3. CKonar
    4. DBokaro
    Answer and explanation →
  12. 12. 44th BPSC Prelims 2000

    When was the Damodar Valley Corporation established?

    1. A1950
    2. B1954
    3. C1948
    4. D1947
    Answer and explanation →
  13. 13. 65th BPSC Prelims 2019

    On which river did Prime Minister Narendra Modi recently lay the foundation stone for the Mandal Dam project?

    1. AKosi
    2. BBurhi Gandak
    3. CFalgu
    4. DNorth Koel
    5. ENone of the above/More than one of the above
    Answer and explanation →
  14. 14. 66th BPSC Prelims Re-exam 2020

    Rana Pratap Sagar Hydroelectric Project on Chambal River is located in the State of :

    1. AMadhya Pradesh
    2. BRajasthan
    3. CUttar Pradesh
    4. DChhattisgarh
    5. ENone of the above / more than one of the above
    Answer and explanation →
  15. 15. BPSC TRE-1 (Aug 2023)

    Which two countries signed the Kosi Irrigation and Hydroelectric Project Agreement in 1954?

    1. AIndia and Bangladesh
    2. BIndia and China
    3. CIndia and Nepal
    4. DMore than one of the above
    5. ENone of the above
    Answer and explanation →
  16. 16. BPSC Assistant Section Officer Mains 2026

    Which of the following rivers is related to the Polavaram project?

    1. AGanga
    2. BYamuna
    3. CGodavari
    4. DKaveri
    Answer and explanation →
  17. 17. UP BEO (Pre) 2019

    Which of the following pairs (Canal Project – Location) is NOT correctly matched?

    1. AGhatprabha Canal Project – Karnataka
    2. BUkai Canal Project – Gujarat
    3. CNira Canal Project – Maharashtra
    4. DJawai Project – Tamil Nadu
    Answer and explanation →
  18. 18. UP Lower Subordinate (Pre) 2015

    Given below are two statements. One is Assertion (A) and the other is Reason (R):

    • Assertion (A): One of the major sources of irrigation in Peninsular India is a pond.
    • Reason (R): Most of the rivers in the Peninsular region are seasonal.

    Select the correct answer using the code given below:

    1. ABoth (A) and (R) are true, and (R) is the correct explanation of (A).
    2. BBoth (A) and (R) are true, but (R) is not the correct explanation of (A).
    3. C(A) is true, but (R) is false.
    4. D(A) is false, but (R) is true.
    Answer and explanation →
  19. 19. UPPSC (Mains) 2015

    In which of the following states, the percentage of total cropped area under irrigation (2011) is the highest?

    1. AMadhya Pradesh
    2. BMaharashtra
    3. CUttar Pradesh
    4. DHaryana
    Answer and explanation →
  20. 20. UP UDA/LDA (Mains) 2010

    Life saving or Protective irrigation refers to:

    1. AConstant flow of water
    2. BIrrigation at critical growth stage
    3. CP.W.P. Irrigation
    4. DAlternate wetting and drying
    Answer and explanation →
  21. 21. UPPSC (Pre) 1995

    During last 25 years, the development of tubewell irrigation has been most spectacular in:

    1. AGanga-Ghaghra Doab
    2. BGanga-Yamuna Doab
    3. CSaryupar Plain
    4. DBundelkhand
    Answer and explanation →
  22. 22. UPPSC (Pre) 2006

    In which state of India, the maximum area is irrigated by tubewells?

    1. AMadhya Pradesh
    2. BBihar
    3. CRajasthan
    4. DUttar Pradesh
    Answer and explanation →
  23. 23. UPPSC (Mains) 2017

    The State having the largest area under tubewell and well irrigation in India is:

    1. AUttar Pradesh
    2. BMadhya Pradesh
    3. CAndhra Pradesh
    4. DPunjab
    Answer and explanation →
  24. 24. UPPSC (Pre) 1999

    The Garland Canal System in India was proposed by:

    1. AK.L. Rao
    2. BDinshaw J. Dastur
    3. CVisvesvaraya
    4. DY.K. Alagh
    Answer and explanation →
  25. 25. UP Lower Subordinate (Pre) 1998

    Mangalam Irrigation Project is located in:

    1. AAndhra Pradesh
    2. BKerala
    3. CTamil Nadu
    4. DWest Bengal
    Answer and explanation →
  26. 26. UPPSC Prelims 2024

    Match List-I with List-II:

    List-I (Canals)List-II (Rivers)
    A. Upper Bari Doab Canal1. Sutlej
    B. Sirhind Canal2. Yamuna
    C. Gurgaon Canal3. Sutlej, Ravi, Beas
    D. Indira Gandhi Canal4. Ravi

    Select the correct answer using the codes given below (in the order A B C D):

    1. A4 1 3 2
    2. B3 2 1 4
    3. C4 1 2 3
    4. D3 1 2 4
    Answer and explanation →
  27. 27. UP UDA/LDA (Pre) 2013

    Which one of the following river projects utilises the water of the Pong barrage of Beas river?

    1. AIndira Gandhi Canal Project
    2. BPochampad Project
    3. CMayurakshi Project
    4. DNagarjuna Sagar Project
    Answer and explanation →
  28. 28. UPPSC (Pre) 2002

    Which of the following is/are the main objectives of the Sharda Sahayak Command Area Development Project?

    • 1. To increase agriculture production
    • 2. To change the format of land use by multiple crop cultivation.
    • 3. Reforms of land management.

    Select the correct answer using the codes given below:

    1. AOnly 1
    2. BOnly 1 & 2
    3. COnly 2 & 3
    4. DAll the above
    Answer and explanation →
  29. 29. UPPSC (GIC) 2010

    The Lower Ganga Canal is taken out of the Ganga at:

    1. AHaridwar
    2. BNarora
    3. CBareilly
    4. DKanpur
    Answer and explanation →
  30. 30. UPPSC Prelims 2025

    With reference to hydroelectricity in North India, which of the following statements is/are correct?

    • 1. There are huge possibilities of hydroelectricity in the Himalayan region.
    • 2. Eastern Uttar Pradesh and Bihar cannot utilise this potential because the Himalayas situated to their North lies in boundary of Nepal.

    Select the correct answer from the code given below:

    1. AOnly 2
    2. BNeither 1 nor 2
    3. CBoth 1 and 2
    4. DOnly 1
    Answer and explanation →
  31. 31. UP Lower Subordinate (Spl) (Pre) 2004

    The beneficiary states of the Sardar Sarovar Project are:

    1. AGujarat, Maharashtra, M.P. and Rajasthan
    2. BAndhra Pradesh, M.P., Gujarat and Maharashtra
    3. COrissa, M.P., Gujarat and Maharashtra
    4. DM.P., Gujarat, Karnataka and Maharashtra
    Answer and explanation →
  32. 32. UPPSC (Pre) 1993

    Maximum benefits occupying state by Sardar Sarovar Dam is:

    1. AGujarat
    2. BOdisha
    3. CMadhya Pradesh
    4. DRajasthan
    Answer and explanation →
  33. 33. UPPSC (Mains) 2003

    In which one of the following water reservoirs, Harsud town of Madhya Pradesh has been submerged?

    1. AIndira Sagar
    2. BRani Avanti Bai dam
    3. CSardar Sarovar
    4. DMahi Dam
    Answer and explanation →
  34. 34. UP UDA/LDA (Spl) (Pre) 2010

    Cauvery River Water Dispute(CRWD) is related to which of the following states?

    1. ATamil Nadu and Karnataka
    2. BTamil Nadu, Karnataka and Kerala
    3. CTamil Nadu, Karnataka, Kerala and Gujarat
    4. DTamil Nadu, Karnataka, Kerala and Puducherry
    Answer and explanation →
  35. 35. UPPSC (Pre) 1993

    Nagarjuna Sagar dam is situated in which state of India?

    1. AAndhra Pradesh
    2. BMadhya Pradesh
    3. CUttar Pradesh
    4. DTamil Nadu
    Answer and explanation →
  36. 36. UP Lower Subordinate (Spl) (Pre) 2009

    The benefits of which one of the following river valley projects are shared by more than one state?

    1. AChambal Valley Project
    2. BMayurakshi Project
    3. CSharavati Project
    4. DHirakud Project
    Answer and explanation →
  37. 37. UPPSC (Mains) 2011

    Which of the following are not associated with the Chambal Valley Project?

    • 1. Gandhi Sagar
    • 2. Jawahar Sagar
    • 3. Gobind Sagar
    • 4. Govind Ballabh Pant Sagar

    Select the correct answer from the code given below:

    1. A1 and 2
    2. B2 and 3
    3. C3 and 4
    4. D1 and 4
    Answer and explanation →
  38. 38. UPPSC (Pre) 2002

    Tehri dam is being constructed in Uttarakhand:

    1. AOn Bhagirathi river
    2. BOn Ramganga river
    3. COn Alaknanda river
    4. DOn Bhilangana rivers
    Answer and explanation →
  39. 39. UPPSC Prelims 2024

    Which one of the following pairs is not correctly matched regarding peculiarities of Ramganga project?

    1. ADam's length - 825.8 metres
    2. BHydropower - 198 MW generation capacity
    3. CLocation - Garhwal (Uttarakhand)
    4. DIrrigated area - 6 lac hectares
    Answer and explanation →
  40. 40. UPPSC (Pre) 2010

    Consider the following statement:

    • Assertion (A): River Damodar was Known as "River of Sorrow" in West Bengal prior to the development of the Damodar Valley Corporation.
    • Reason (R): Damodar in its upper reaches flows rapidly and in its lower reaches it runs too sluggishly.

    Select the correct answer using the code given below:

    1. ABoth (A) and (R) are true, and (R) is the correct explanation of (A).
    2. BBoth (A) and (R) are true, but (R) is not the correct explanation of (A).
    3. C(A) is true, but (R) is false.
    4. D(A) is false, but (R) is true.
    Answer and explanation →
  41. 41. UP BEO (Pre) 2019

    Match List-I with List-II:

    List-I (Projects)List-II (Rivers)
    A. Ukai1. Godavari
    B. Jayakawadi2. Ambi
    C. Khadakwasla3. Mutha
    D. Maurakshi4. Tapi

    Select the correct answer using the codes given below (in the order A B C D):

    1. A4 1 2 3
    2. B4 1 3 2
    3. C1 3 4 2
    4. D3 4 2 1
    Answer and explanation →
  42. 42. UP Lower Subordinate (Pre) 2015

    Which of the following pairs is not correctly matched?

    1. AMidnapur Canal: Kangsabati River (Kasai)
    2. BTawa Project: Krishna River
    3. CMettur Dam: Cauvery River
    4. DUkai Project: Tapi River
    Answer and explanation →
  43. 43. UPPSC (Pre) 1995

    Match List-I with List-II:

    List-I (Project)List-II (Location)
    A. Bhakhra1. Krishna
    B. Hirakud2. Periyar
    C. Idukki3. Mahanadi
    D. Nagarjuna Sagar4. Satluj

    Select the correct answer using the codes given below (in the order A B C D):

    1. A1 2 3 4
    2. B4 3 2 1
    3. C3 4 1 2
    4. D4 1 3 2
    Answer and explanation →
  44. 44. UPPSC (Pre) 1999

    Which of the following projects is the joint venture of Tamil Nadu, Andhra Pradesh and Karnataka:

    1. ADakshin Gangotri
    2. BNagarjuna Sagar
    3. CSilent Valley
    4. DTelugu Ganga
    Answer and explanation →
  45. 45. UPPSC (Spl) (Pre) 2008

    Match List-I with List-II:

    List-IList-II
    A. Metturi. Tamil Nadu
    B. Mayurakshiii. Andhra Pradesh
    C. Nagarjuna Sagariii. West Bengal
    D. Hirakudiv. Odisha

    Select the correct answer using the codes given below:

    1. A(i) (iii) (ii) (iv)
    2. B(ii) (iv) (iii) (i)
    3. C(iv) (iii) (i) (ii)
    4. D(iii) (i) (iv) (ii)
    Answer and explanation →
  46. 46. UPPSC (Pre) 2003

    Match List-I with List-II:

    List-I (Multipurpose Projects)List-II (Rivers)
    A. Idukki1. Betwa
    B. Matatilla2. Godavari
    C. Nagarjuna Sagar3. Krishna
    D. Pochampad4. Periyar

    Select the correct answer using the codes given below (in the order A B C D):

    1. A4 2 3 1
    2. B2 1 3 4
    3. C4 1 3 2
    4. D1 3 4 2
    Answer and explanation →
  47. 47. UP RO/ARO (Pre) (Re-Exam) 2016

    Consider the following statements and select the correct answer from the codes given below.

    • 1. Rihand Dam is on a tributary of the Sone river.
    • 2. Hirakund Dam is on Mahanadi river.
    • 3. Tungabhadra Project is a joint venture of Andhra Pradesh and Karnataka.
    • 4. Maithan Dam is on Barakar river, a tributary of Damodar river.
    1. A1, 2 and 3 are correct
    2. B1, 2 and 4 are correct
    3. C1, 3 and 4 are correct
    4. D1, 2, 3 and 4 are correct
    Answer and explanation →
  48. 48. UP Lower Subordinate (Pre) 2002

    Kalpong Hydroelectric Power project is located in:

    1. AAndaman and Nicobar Islands
    2. BArunachal Pradesh
    3. CMeghalaya
    4. DSikkim
    Answer and explanation →
  49. 49. UPPSC (Pre) 2003

    Match List-I with List-II:

    List-IList-II
    A. Farakka1. West Bengal
    B. Ghataprabha2. Odisha
    C. Hirakud3. Gujarat
    D. Kakrapar4. Karnataka

    Select the correct answer using the codes given below (in the order A B C D):

    1. A1 4 2 3
    2. B2 4 3 1
    3. C4 3 2 1
    4. D1 2 3 4
    Answer and explanation →
  50. 50. UPPSC (Pre) 2000

    Tulbul project is associated with the river:

    1. ABeas
    2. BRavi
    3. CJhelum
    4. DSatluj
    Answer and explanation →
  51. 51. UPPSC (Pre) 2009

    Baglihar hydropower project, the issue of which was raised by Pakistan before the World Bank, is being constructed by India on:

    1. AJhelum
    2. BIndus
    3. CChenab
    4. DSutlej
    Answer and explanation →
  52. 52. UP Lower Subordinate (Spl) (Pre) 2004

    Which one of the following is NOT correctly matched?

    1. AKalpakkam – Tamil Nadu
    2. BRana Pratap Sagar – Madhya Pradesh
    3. CNarora – Uttar Pradesh
    4. DTarapore – Maharashtra
    Answer and explanation →
  53. 53. UPPSC (Pre) 2010

    The Kalpasar Project, a fresh water reservoir is located in:

    1. AGujarat
    2. BHaryana
    3. CMaharashtra
    4. DRajasthan
    Answer and explanation →
  54. 54. UPPSC (Pre) 2010

    In which one of the following states is Suil river project located?

    1. AUttarakhand
    2. BHaryana
    3. CPunjab
    4. DHimachal Pradesh
    Answer and explanation →
  55. 55. UPPSC (Mains) 2009

    Which one of the following pairs (Power Project – State) is not correctly matched?

    1. AJawahar Sagar - Rajasthan
    2. BNagarjuna Sagar - Andhra Pradesh
    3. CSivasamudram - Kerala
    4. DGandhi Sagar - Madhya Pradesh
    Answer and explanation →
  56. 56. UPPSC Prelims 2012

    Which one of the following is not correctly matched?

    1. ANangal Dam - Satluj River
    2. BSardar Sarovar Project - Narmada River
    3. CNagarjuna Sagar - Godavari River
    4. DHirakud Dam - Mahanadi
    Answer and explanation →
  57. 57. UPPSC Prelims 2025

    Which of the following pairs (Dam – River) is/are NOT correctly matched?

    • 1. Baglihar Dam – Chenab
    • 2. Pandoh Dam – Ravi
    • 3. Srisailam Dam – Tungabhadra

    Select the correct answer from the code given below:

    1. A1 and 2
    2. BOnly 3
    3. C2 and 3
    4. DOnly 1
    Answer and explanation →
  58. 58. UPPSC (Mains) 2003

    Teesta Low Dam Project (TLDP)-III is proposed along the Teesta river. The site of the project lies in:

    1. AAssam
    2. BWest Bengal
    3. CNagaland
    4. DMeghalaya
    Answer and explanation →
  59. 59. UPPSC (GIC) 2010

    Match List-I with List-II:

    List-I (Multipurpose Project)List-II (River)
    A. Rihand Project1. Ramganga
    B. Rani Laxmibai Dam Project2. Bhagirathi
    C. Tehri Dam Project3. Son
    D. Ramganga Project4. Betwa

    Select the correct answer using the codes given below (in the order A B C D):

    1. A3 2 1 4
    2. B1 2 3 4
    3. C3 4 2 1
    4. D4 3 2 1
    Answer and explanation →
  60. 60. UPPSC (Spl) (Mains) 2004

    Which of the following pairs is not correctly matched?

    1. ADulhasti - Chenab
    2. BIndira Gandhi canal - Sutlej
    3. CNagarjuna Sagar - Kaveri(Cauvery)
    4. DUkkai - Tapti
    Answer and explanation →
  61. 61. UPPSC (Mains) 2006

    Match List-I with List-II:

    List-I (Reservoir)List-II (State)
    A. Bhadra1. Karnataka
    B. Bhavani Sagar2. Madhya Pradesh
    C. Gandhi Sagar3. Rajasthan
    D. Rana Pratap Sagar4. Tamil Nadu

    Select the correct answer using the codes given below (in the order A B C D):

    1. A3 4 2 1
    2. B1 2 3 4
    3. C4 2 1 3
    4. D1 4 2 3
    Answer and explanation →
  62. 62. UP UDA/LDA (Pre) 2013

    Which of the following pairs is not correctly matched?

    1. ASardar Sarovar Dam - Narmada river
    2. BTilaiya Dam - Konar river
    3. CGandhi Sagar Dam - Chambal river
    4. DNagarjuna Sagar Dam - Krishna river
    Answer and explanation →
  63. 63. UPPSC (RI) 2014

    Match List-I with List-II:

    List-I (Rivers)List-II (Dams)
    A. Betwa1. Hirakud
    B. Mahanadi2. Matatila
    C. Chambal3. Kakrapar
    D. Tapi4. Gandhi Sagar

    Select the correct answer using the codes given below (in the order A B C D):

    1. A3 4 1 2
    2. B2 1 4 3
    3. C1 2 3 4
    4. D4 3 2 1
    Answer and explanation →
  64. 64. UPPSC (Mains) 2014

    Match List-I with List-II:

    List-I (River Valley Project)List-II (River)
    A. Tilaiya Dam1. Damodar
    B. Panchet Hill Dam2. Chambal
    C. Rana Pratap Sagar Dam3. Barakar
    D. Matatila Dam4. Betwa

    Select the correct answer using the codes given below (in the order A B C D):

    1. A3 1 2 4
    2. B2 3 4 1
    3. C1 2 3 4
    4. D4 1 2 3
    Answer and explanation →
  65. 65. UP RO/ARO (Mains) 2016

    Match List-I with List-II:

    List-I (River Valley Project)List-II (River)
    A. Rihand Project1. Godavari
    B. Nagarjun Sagar Project2. Betwa
    C. Pochampad Project3. Rihand
    D. Matatila Project4. Krishna

    Select the correct answer using the codes given below (in the order A B C D):

    1. A1 4 3 2
    2. B3 2 4 1
    3. C3 1 2 4
    4. D3 4 1 2
    Answer and explanation →
  66. 66. UPPSC (Mains) 2012

    The most controversial 'Babli Project' is situated in which of the following States?

    1. AAndhra Pradesh
    2. BGujarat
    3. CMadhya Pradesh
    4. DMaharashtra
    Answer and explanation →
  67. 67. UP RO/ARO (Pre) 2017

    Match List-I with List-II:

    List-I (Dam)List-II (River)
    A. Doolhasti1. Chambal
    B. Gandhisagar2. Chenab
    C. Ukkai3. Tapi
    D. Tawa4. Tawa

    Select the correct answer using the codes given below (in the order A B C D):

    1. A1 2 3 4
    2. B3 2 1 4
    3. C2 3 1 4
    4. D2 1 3 4
    Answer and explanation →
  68. 68. UP RO/ARO (Mains) 2017

    Malampuzha dam is situated on which river?

    1. ABharatpuzha
    2. BKorapuzha
    3. CMalampuzha
    4. DPamba
    Answer and explanation →
  69. 69. UP RO/ARO (Mains) 2017

    Singrauli Small Hydro Power Project is located in:

    1. AMadhya Pradesh
    2. BBihar
    3. CChhattisgarh
    4. DUttar Pradesh
    Answer and explanation →
  70. 70. UP RO/ARO (Mains) 2017

    Cheruthoni Dam is situated on which river?

    1. APeriyar
    2. BPampar
    3. CBhavani
    4. DKabini
    Answer and explanation →
  71. 71. UPPSC (Mains) 2017

    Kol Dam Project has been constructed on which of the following rivers in India?

    1. AKrishna
    2. BSutlej
    3. CGodavari
    4. DNarmada
    Answer and explanation →
  72. 72. UPPSC Prelims 2019

    Which hydropower plant in Bhutan was inaugurated recently by Indian Prime Minister Narendra Modi?

    1. AChhukha Power Plant
    2. BDagachhu Power Plant
    3. CKurichha Power Plant
    4. DMangdechhu Power Plant
    Answer and explanation →
  73. 73. UPSC (Pre) 2022

    Consider the following pairs:

    ReservoirState
    1. GhataprabhaTelangana
    2. Gandhi SagarMadhya Pradesh
    3. Indira SagarAndhra Pradesh
    4. MaithonChhattisgarh

    How many pairs given above are NOT correctly matched?

    1. AOnly one pair
    2. BOnly two pairs
    3. COnly three pairs
    4. DAll four pairs
    Answer and explanation →
  74. 74. UPSC (Pre) 2020

    Consider the following statements:

    • 1. 36% of India's districts are classified as 'overexploited' or 'critical' by the Central Ground Water Authority (CGWA).
    • 2. CGWA was formed under the Environment (Protection) Act.
    • 3. India has the largest area under groundwater irrigation in the world.

    Which of the statements given above is/are correct?

    1. A1 only
    2. B2 and 3 only
    3. C2 only
    4. D1 and 3 only
    Answer and explanation →
  75. 75. UPSC (Pre) 2019

    What is common to the places known as Aliyar, Isapur and Kangsabati?

    1. ARecently discovered uranium deposits
    2. BTropical rain forests
    3. CUnderground cave systems
    4. DWater reservoirs
    Answer and explanation →
  76. 76. UPSC (Pre) 2000

    Which one of the following statements is not true?

    1. AGhaggar's water is utilised in the Indira Gandhi Canal
    2. BNarmada rises from Amarkantak region
    3. CNizam Sagar is situated on the Manjra river
    4. DPenganga is a tributary of the Godavari
    Answer and explanation →
  77. 77. UPSC (Pre) 2008

    Consider the following pairs:

    Irrigation projectState
    1. DamangangaGujarat
    2. GirnaMaharashtra
    3. PambaKerala

    Which of the above pairs are correctly matched?

    1. A1 and 2 only
    2. B2 and 3 only
    3. C1 and 3 only
    4. D1, 2 and 3
    Answer and explanation →
  78. 78. UPSC (Pre) 2006

    Recently Uttar Pradesh and Madhya Pradesh governments signed a Memorandum of Understanding for the linking of two rivers as a link project. Which are these two rivers?

    1. ABetwa and Chambal
    2. BBetwa and Ken
    3. CChambal and Son
    4. DKen and Narmada
    Answer and explanation →
  79. 79. UPSC (Pre) 2005

    Gandhi Sagar Dam is a part of which one of the following?

    1. AChambal Project
    2. BKosi Project
    3. CDamodar Valley Project
    4. DBhakra Nangal Project
    Answer and explanation →
  80. 80. UPSC (Pre) 2004

    Consider the following statements:

    • 1. Damodar Valley Corporation is the first multipurpose river valley project of independent India.
    • 2. Damodar Valley Corporation includes thermal and gas power stations.

    Which of the statements given above is/are correct?

    1. A1 only
    2. B2 only
    3. CBoth 1 and 2
    4. DNeither 1 nor 2
    Answer and explanation →
  81. 81. UPSC (Pre) 1999

    Match List-I with List-II:

    List-I (River)List-II (Dam)
    I. CauveryA. Alamatti
    II. KrishnaB. Mettur
    III. NarmadaC. Gandhi Sagar
    IV. ChambalD. Sardar Sarovar

    Select the correct answer using the code given below:

    1. AI-A, II-D, III-B, IV-C
    2. BI-B, II-A, III-D, IV-C
    3. CI-B, II-A, III-C, IV-D
    4. DI-A, II-C, III-D, IV-B
    Answer and explanation →
  82. 82. UPSC (Pre) 1997

    The Alamatti Dam is on the river:

    1. AGodavari
    2. BCauvery
    3. CKrishna
    4. DMahanadi
    Answer and explanation →
  83. 83. UPSC (Pre) 1997

    The canal-carrying capacity of Farakka is:

    1. A75,000 cusecs
    2. B70,000 cusecs
    3. C40,000 cusecs
    4. D35,000 cusecs
    Answer and explanation →
  84. 84. UPSC (Pre) 1999

    In the given figure, the site of the Tehri dam is labelled:

    Sketch of rivers in the Garhwal Himalaya, naming the Bhilangana, Alaknanda and Ganga rivers and Devprayag; four sites are marked: A at the top, near the Bhilangana; B to the right; C where two rivers meet in the middle; and D near the Ganga at the bottom.
    1. AA
    2. BB
    3. CC
    4. DD
    Answer and explanation →