  1. 1. 63rd BPSC Prelims 2017

    What is the share of hydroelectric power in the total electricity produced in India?

    1. A10 percent
    2. B12 percent
    3. C20 percent
    4. D22 percent
    5. ENone of the above / More than one of the above
    Answer and explanation →
  2. 2. 65th BPSC Prelims Re-exam 2020

    In India, the share of renewable energy in total electricity production increased from 6 percent in 2014–15 to what percentage in 2018–19?

    1. A12 percent
    2. B14 percent
    3. C10 percent
    4. D7 percent
    5. ENone of the above / More than one of the above
    Answer and explanation →
  3. 3. 47th BPSC Prelims 2005

    Which one of the following statements about energy production and consumption in India is not correct?

    1. ADuring the last decade, energy production in India has shown a declining trend
    2. BThe per capita energy consumption in the world is the lowest in India
    3. CThe non-conventional sources of energy contribute less than one percent of the total commercial energy produced in India
    4. DThe industry is the major energy consuming sector in India
    Answer and explanation →
  4. 4. 53rd–55th BPSC Prelims 2011

    In India, per capita consumption of energy in 1994 was –

    1. A300 kg. of oil equivalent
    2. B360 kg. of oil equivalent
    3. C243 kg. of oil equivalent
    4. D343 kg. of oil equivalent
    Answer and explanation →
  5. 5. 53rd–55th BPSC Prelims 2011

    Consider the following causes of the financial weakness of State Electricity Boards in India— I. Sale of electricity to agricultural and domestic consumers at prices lower than the cost of production. II. High transmission and distribution losses. III. Lack of commercial autonomy of State Electricity Boards. IV. Implementation of social subsidy policies through State Electricity Boards by state governments. Which of the above are correct?

    1. AI, II and III
    2. BI, II, III and IV
    3. CI, III and IV
    4. DII, III and IV
    Answer and explanation →
  6. 6. 66th BPSC Prelims 2020

    Which one of the following States is a leading producer of solar energy in India?

    1. ATelangana
    2. BKarnataka
    3. CAndhra Pradesh
    4. DRajasthan
    5. ENone of the above/More than one of the above
    Answer and explanation →
  7. 7. 44th BPSC Prelims 2000

    Solar energy is obtained from which of the following?

    1. AMoon
    2. BSea
    3. CSun
    4. DWind
    Answer and explanation →
  8. 8. 40th BPSC Prelims 1995

    Which of the following has the largest reserve of alternative energy?

    1. ASolar energy
    2. BTidal energy
    3. CNuclear energy
    4. DGeothermal energy
    Answer and explanation →
  9. 9. BPSC CDPO Prelims 2005

    Kaiga—

    1. AIt is near Mangaluru; there is a nuclear power plant here
    2. BIt is a new industrial centre in Tamil Nadu
    3. CIt is in Maharashtra and is known for the information technology industry
    4. DIt is on the Konkan coast and is known for beautiful scenery
    Answer and explanation →
  10. 10. 44th BPSC Prelims 2000

    When was the Oil and Natural Gas Commission (ONGC) established?

    1. A1856
    2. B1914
    3. C1936
    4. D1956
    Answer and explanation →
  11. 11. UPPSC Prelims 2021

    With reference to NTPC unit at Singrauli, which of the following statement/s is / are correct?

    • 1. It is situated in Northern part of Chhattisgarh State.
    • 2. It is NTPC's oldest unit.

    Select the correct answer using the codes given below:

    1. AOnly 1
    2. BOnly 2
    3. CBoth 1 and 2
    4. DNeither 1 nor 2
    Answer and explanation →
  12. 12. UPPSC Prelims 2017

    Which of the following pairs are correctly matched.

    • 1. Idukki: Thermal power station
    • 2. Sabarigiri: Hydro - electric project
    • 3. Ghatprabha: Irrigation Project
    • 4. Ramganga: Multipurpose project

    Select the correct answer using the codes given below:

    1. A2, 3 and 4
    2. B1, 2, 3 and 4
    3. C3 and 4
    4. D1 and 2
    Answer and explanation →
  13. 13. UPPSC Prelims 2013

    Match List-I with List-II:

    List-IList-II
    A. Ukkai1. Jharkhand
    B. Patratu2. Gujarat
    C. Pench3. Maharashtra
    D. Dabhol4. Madhya Pradesh

    Select the correct answer using the codes given below (in the order A B C D):

    1. A4 2 3 1
    2. B2 1 4 3
    3. C3 2 1 4
    4. D1 3 4 2
    Answer and explanation →
  14. 14. UPPSC (Mains) 2010

    Uran is a gas-based power project in:

    1. AGujarat
    2. BKarnataka
    3. CMaharashtra
    4. DTamil Nadu
    Answer and explanation →
  15. 15. UPPSC (Spl) (Pre) 2008

    The largest source of energy in India is:

    1. ANuclear
    2. BPetroleum
    3. CCoal
    4. DHydroelectricity
    Answer and explanation →
  16. 16. UPPSC (Mains) 2006

    The highest share in power generation in India is of:

    1. AAtomic power
    2. BHydropower
    3. CThermal power
    4. DAll above have equal shares
    Answer and explanation →
  17. 17. UP UDA/LDA (Pre) 2010

    The correct sequence of energy sources in order of their share in the power sector in India is:

    1. AThermal > Hydro > Nuclear > Wind
    2. BThermal > Nuclear > Hydro > Wind
    3. CHydro > Nuclear > Thermal > Wind
    4. DNuclear > Hydro > Wind > Thermal
    Answer and explanation →
  18. 18. UP RO/ARO (Pre) 2016

    Consider the following means of energy production:

    • 1. Water
    • 2. Natural gas
    • 3. Nuclear
    • 4. Diesel

    Arrange them in descending order of their share (as on 30 September 2019) in India's total installed power generation capacity.

    1. A1, 3, 4, 2
    2. B3, 2, 1, 4
    3. C1, 2, 3, 4
    4. D2, 1, 4, 3
    Answer and explanation →
  19. 19. UP Lower Subordinate (Spl) (Pre) 2004

    Ramagundam Super Thermal Power Station is located in:

    1. AAndhra Pradesh
    2. BJharkhand
    3. CMadhya Pradesh
    4. DKarnataka
    Answer and explanation →
  20. 20. UPPSC (Spl) (Mains) 2008

    With the help of which of the following countries, was the Thermal Power Centre at Obra established?

    1. AAmerica
    2. BGermany
    3. CJapan
    4. DRussia
    Answer and explanation →
  21. 21. UP RO/ARO (Pre) 2023

    Match List-I with List-II:

    List-I (Coal Based Power Plant)List-II (Located in State)
    A. Kahalgaon1. Madhya Pradesh
    B. Khargone2. Bihar
    C. Korba3. Karnataka
    D. Kudgi4. Chhattisgarh

    Select the correct answer using the codes given below:

    1. AA-1, B-2, C-4, D-3
    2. BA-2, B-1, C-3, D-4
    3. CA-1, B-2, C-3, D-4
    4. DA-2, B-1, C-4, D-3
    Answer and explanation →
  22. 22. UPPSC (Mains) 2006

    Which one of the following pairs is not correctly matched?

    1. ABadarpur - Delhi
    2. BHarduaganj - Uttar Pradesh
    3. CUtaran - Gujarat
    4. DParas - Andhra Pradesh
    Answer and explanation →
  23. 23. UPPSC (Spl) (Mains) 2008

    Match List-I with List-II:

    List-I (States)List-II (Rank in installed thermal power capacity)
    A. Gujarat1. First
    B. Maharashtra2. Second
    C. Uttar Pradesh3. Third
    D. West Bengal4. Fourth

    Select the correct answer using the codes given below (in the order A B C D):

    1. A4 3 1 2
    2. B2 1 4 3
    3. C3 4 1 2
    4. D1 2 4 3
    Answer and explanation →
  24. 24. UPPSC (Spl) (Mains) 2004

    Average All-India Thermal Plant Load Factor (PLF) in recent years has been varying between:

    1. A60-65 percent
    2. B65-70 percent
    3. C70-75 percent
    4. D80-85 percent
    Answer and explanation →
  25. 25. UP RO/ARO (Mains) 2016

    Which of the following pairs (Station – Power) is not correctly matched?

    1. APatratu – Thermal
    2. BJhakri – Hydroelectric
    3. CKalpakkam – Nuclear
    4. DKorba – Wind
    Answer and explanation →
  26. 26. UPPSC Prelims 2023

    Shivanasamudra and Kalpakkam are respectively important for:

    1. AHydel Power and Nuclear Energy
    2. BThermal Power and Nuclear Energy
    3. CNuclear Energy and Hydel Power
    4. DSolar Power and Nuclear Energy
    Answer and explanation →
  27. 27. UPPSC (Mains) 2005

    India is self-sufficient in the supply of:

    1. AUranium
    2. BThorium
    3. CIridium
    4. DPlutonium
    Answer and explanation →
  28. 28. UPPSC (Pre) 1999

    Match List-I with List-II:

    List-IList-II
    A. Kota1. U.P.
    B. Tarapur2. Gujarat
    C. Kakrapara3. Maharashtra
    D. Narora4. Rajasthan

    Select the correct answer using the codes given below (in the order A B C D):

    1. A1 2 3 4
    2. B4 3 2 1
    3. C3 4 1 2
    4. D3 2 1 4
    Answer and explanation →
  29. 29. UPPSC (Mains) 2007

    Which one of the following pairs (Nuclear Plant – Year of Commissioning) is correctly matched?

    1. AKota – 1989
    2. BKakrapara – 1984
    3. CKaiga – 1999
    4. DKalpakkam – 1995
    Answer and explanation →
  30. 30. UP UDA/LDA (Pre) 2006

    Consider the following statements:

    • Assertion (A): Nuclear energy is a promising source of futuristic demand for energy supply in India.
    • Reason (R): Nuclear minerals are ubiquitously available in India.

    Select the correct answer using the code given below:

    1. ABoth (A) and (R) are true, and (R) is the correct explanation of (A).
    2. BBoth (A) and (R) are true, but (R) is not the correct explanation of (A).
    3. C(A) is true, but (R) is false.
    4. D(A) is false, but (R) is true.
    Answer and explanation →
  31. 31. UPPSC (Mains) 2015

    Which one of the following is not correctly matched?

    1. AKaiga - Karnataka
    2. BRawat Bhata - Rajasthan
    3. CMuppandal - Tamil Nadu
    4. DEnnore - Meghalaya
    Answer and explanation →
  32. 32. UP RO/ARO (Pre) 2014

    'Mithi Virdi' Nuclear Power Plant will be set up in collaboration with which of the following countries?

    1. AUSA
    2. BCanada
    3. CRussia
    4. DFrance
    Answer and explanation →
  33. 33. UPPSC Prelims 2015

    Anushakti Vidyut Nigam Limited is a joint venture of the Nuclear Power Corporation of India and:

    1. ANMDC
    2. BNHPC
    3. CBHEL
    4. DNTPC
    Answer and explanation →
  34. 34. UPPSC (GIC) 2017

    Which of the following pairs related to States of India and proposed nuclear power plants is not correctly matched?

    1. AJaitpur - Maharashtra
    2. BMithi Virdi - Gujarat
    3. CHaripur - Haryana
    4. DKovvadda- Andhra Pradesh
    Answer and explanation →
  35. 35. UPPSC (Pre) 1992

    Where is the hydroelectric station located?

    1. AKoyna
    2. BNeyveli
    3. CKathgodam
    4. DTrombay
    Answer and explanation →
  36. 36. UP BEO (Pre) 2019

    Match List-I with List-II:

    List-I (Power Plants)List-II (Type of Energy)
    A. Chamera1. Atomic Power
    B. Gwal Pahari2. Thermal Power
    C. Kudankulam3. Hydro Power
    D. Patratu4. Solar Power

    Select the correct answer using the codes given below (in the order A B C D):

    1. A1 2 3 4
    2. B2 4 3 1
    3. C4 3 2 1
    4. D3 4 1 2
    Answer and explanation →
  37. 37. UP UDA/LDA (Pre) 2013

    Which among the following ranks first in wind power generation?

    1. AGujarat
    2. BMaharashtra
    3. CKarnataka
    4. DRajasthan
    Answer and explanation →
  38. 38. UPPSC (Pre) 1999

    The biggest wind energy project in Asia with a capacity of 150 megawatts is located in:

    1. AGujarat
    2. BMaharashtra
    3. CTamil Nadu
    4. DKarnataka
    Answer and explanation →
  39. 39. UPPSC Prelims 2022

    Which of the following coasts is the largest tidal energy producing area in India?

    1. AMannar Coast
    2. BKerala Coast
    3. CNorth Circars Coast
    4. DKhambhat Coast
    Answer and explanation →
  40. 40. UPPSC (Pre) 1991

    Most potential area for tidal energy in India is?

    1. AMadras
    2. BCochin
    3. CVisakhapatnam
    4. DBhavnagar
    Answer and explanation →
  41. 41. UPPSC (Mains) 2006

    Which one of the following states of India ranks first in installed capacity and generation of electricity?

    1. AAndhra Pradesh
    2. BGujarat
    3. CMaharashtra
    4. DTamil Nadu
    Answer and explanation →
  42. 42. UP UDA/LDA (Pre) 2010

    Rampura, which became the first village in India to have its solar power plant, is situated in:

    1. AMadhya Pradesh
    2. BHimachal Pradesh
    3. CAndhra Pradesh
    4. DUttar Pradesh
    Answer and explanation →
  43. 43. UP RO/ARO (Mains) 2014

    Which of the following pairs (Hot Spring – State) is not correctly matched?

    1. ALasundra – Rajasthan
    2. BAvaloli – Maharashtra
    3. CManikaran – Himachal Pradesh
    4. DSohna – Haryana
    Answer and explanation →
  44. 44. UPPSC Prelims 2015

    Which of the following pairs (Hot Spring – Location) is not correctly matched?

    1. AManikaran - Himachal Pradesh
    2. BJwalamukhi - Jammu and Kashmir
    3. CAnhoni - Madhya Pradesh
    4. DTapta Pani - Odisha
    Answer and explanation →
  45. 45. UP RO/ARO (Mains) 2013

    Which of the following source of energy is not a commercial source?

    1. APetroleum
    2. BAtomic Energy
    3. CNatural Gas
    4. DBiogas
    Answer and explanation →
  46. 46. UP RO/ARO (Pre) 2017

    The first Union Territory of India to run 100 percent on solar energy is:

    1. AChandigarh
    2. BDiu
    3. CAndaman - Nicobar
    4. DPuducherry
    Answer and explanation →
  47. 47. UPSC (Pre) 2009

    The Dul Hasti Power Station is based on which one of the following rivers?

    1. ABeas
    2. BChenab
    3. CRavi
    4. DSutlej
    Answer and explanation →
  48. 48. UPSC (Pre) 2008

    With which one of the following rivers is the Omkareshwar Project associated?

    1. AChambal
    2. BNarmada
    3. CTapi
    4. DBhima
    Answer and explanation →
  49. 49. UPSC (Pre) 2008

    On which one of the following rivers is the Tehri Hydropower Complex located?

    1. AAlaknanda
    2. BBhagirathi
    3. CDhauliganga
    4. DMandakini
    Answer and explanation →
  50. 50. UPSC (Pre) 2008

    Where are Tapovan and Vishnugarh Hydroelectric Projects located?

    1. AMadhya Pradesh
    2. BUttar Pradesh
    3. CUttarakhand
    4. DRajasthan
    Answer and explanation →
  51. 51. UPSC (Pre) 2005

    Match List-I with List-II:

    List-I (Power station)List-II (State)
    A. Kothagudem1. Andhra Pradesh
    B. Raichur2. Gujarat
    C. Mettur3. Karnataka
    D. Wanakbori4. Tamil Nadu

    Select the correct answer using the code given below:

    1. AA-4, B-2, C-1, D-3
    2. BA-1, B-3, C-4, D-2
    3. CA-4, B-3, C-1, D-2
    4. DA-1, B-2, C-4, D-3
    Answer and explanation →
  52. 52. UPSC (Pre) 2005

    For which one of the following is Satara well-known?

    1. AThermal power plant
    2. BWind energy plant
    3. CHydro electric plant
    4. DNuclear power plant
    Answer and explanation →
  53. 53. UPSC (Pre) 2003

    The thermal power plant of Bokaro is located in:

    1. ABihar
    2. BChhattisgarh
    3. CJharkhand
    4. DOrissa
    Answer and explanation →