The correct sequence of energy sources in order of their share in the power sector in India is:
- AThermal > Hydro > Nuclear > Wind
- BThermal > Nuclear > Hydro > Wind
- CHydro > Nuclear > Thermal > Wind
- DNuclear > Hydro > Wind > Thermal
Show answer and explanation
None of the options is correct, so no answer is marked.
Explanation
As on 31 December 2025, by installed capacity the order is thermal (246,941.63 MW), wind (54,510.93 MW), hydro (50,914.66 MW) and nuclear (8,780 MW), which no option gives. Among renewable sources, installed capacity was 5,158.61 MW for small hydro, 54,510.93 MW for wind, 11,613.93 MW for bio-energy (waste-to-energy included) and 135,809.94 MW for solar.
No option fits: by installed capacity the order is thermal > wind > hydro > nuclear.