Mohan can do a piece of work in 25 days and Sohan in 20 days. Both work together for 5 days, and then Mohan leaves. How long will Sohan take to complete the remaining work?

  1. A20 days
  2. B11 days
  3. C14 days
  4. D21 days
  5. ENone of the above / More than one of the above

66th BPSC Prelims 2020

Show answer and explanation

Correct answer: (b) 11 days

Explanation

Take the work as 100 units (LCM of 25 and 20): Mohan does 4 units a day and Sohan 5. In 5 days together they do 45 units, leaving 55. Sohan alone needs 55 ÷ 5 = 11 days.